22 kW• Semi-fast24/7Active in MITECO registry

9176-Sant Antoni de Vilamajor

Carrer Ferran Llach S/N, Sant Antoni de Vilamajor (08459), Barcelona, Spain
Network OperatorBONPREU, S.A.U.
Total Capacity2 bays (2 plugs)
GPS Coordinates41.66958, 2.40278
Official ID16YBZPKHPO58FAQR0XVB
Official Registry DateJun 19, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sant Antoni de Vilamajor, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the BONPREU, S.A.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:220 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:220 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code16YBZPKHPO58FAQR0XVB
Post / EVSE Identifier #1ENKYOOM6ORUEMUWGSUUPUNIP5KU
Post / EVSE Identifier #2ES*BEM*P91761
Post / EVSE Identifier #31
Post / EVSE Identifier #43EA1OQFVIRDH9I9R7U7QZY2NIDQ
Post / EVSE Identifier #5ES*BEM*P91762
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CONTACTLESS
📱Mobile App (Remote activation & eMSP roaming)
✓COMPATIBLE CON TARJETAS CON CHIP
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO

Accessibility & Amenities

Standard public access. Additional amenities: SUPERMERCADO, APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.669585 | Lon: 2.402777View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
10.4 km away

Gasuir La Garriga

C-17
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.