50 kW• Fast24/7Active in MITECO registry

9007-Vinyols i els Arcs

Ctra N340 Km 1 145, Vinyols i els Arcs (43391), Tarragona, Spain
Network OperatorBONPREU, S.A.U.
Total Capacity3 bays (3 plugs)
GPS Coordinates41.07944, 1.06277
Official IDCI9GLBNRAQBQQQJF9SQF
Official Registry DateMay 21, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Vinyols i els Arcs, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the BONPREU, S.A.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:220 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeCI9GLBNRAQBQQQJF9SQF
Post / EVSE Identifier #1BRYZIECZXTNTJQMOIHAYEP4S8RB
Post / EVSE Identifier #2ES*BEM*P90071
Post / EVSE Identifier #31A
Post / EVSE Identifier #4IYW9WR9CNVNUARQDJGKXVUOFUG9
Post / EVSE Identifier #5ES*BEM*P90071B
Post / EVSE Identifier #61B
Post / EVSE Identifier #78IB8OWP0ROGUC64UBZ56VUNINA7
Post / EVSE Identifier #8ES*BEM*P90072
Post / EVSE Identifier #92

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CON CHIP
✓COMPATIBLE CON TARJETAS CONTACTLESS
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO, ESTACIÓN DE SERVICIO, SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.07944 | Lon: 1.062774View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
2.3 km away

T-Cambrils-004

Area Cooperativa Cambrils,41
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
4 points • 5 plugs
Details
50 kW(Fast)
2.3 km away

T-Cambrils-001

Montbrió,2
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 6 plugs
Details
7.4 kW(Semi-fast)
7.2 km away

APK2 Salou

C/ Logroño S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.