5.5 kW• Standard🏨Hotel / Alojamiento24/7Active in MITECO registry

21XP22T3KKJAK00361

Hotel Ayre - C. Poeta Alonso De Bonilla, 3,, Córdoba (14012), Córdoba, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates37.91577, -4.80284
Official ID2024005253
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Córdoba, belonging to the province of Córdoba (Andalucía, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
5.5 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
5.5 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024005253
Post / EVSE Identifier #1COD20240000041453PR00013626
Post / EVSE Identifier #2ES*ESX*E21XP22T3KKJAK003611
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000041454PR00013627
Post / EVSE Identifier #5ES*ESX*E21XP22T3KKJAK003612
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (5.5 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~3 h 38 min(~3.6 hours)
40 kWh Battery~7 h 16 min(~7.3 hours)
60 kWh Battery~10 h 55 min(~10.9 hours)
80 kWh Battery~14 h 33 min(~14.5 hours)

Opening Hours

Martes (00:00 - 00:00) Sabado (00:00 - 00:00) Viernes (00:00 - 00:00) Lunes (00:00 - 00:00) Miercoles (00:00 - 00:00) Jueves (00:00 - 00:00) Domingo (00:00 - 00:00)

Supported Payment Methods

📅Advance slot reservation supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
🔓Remote plug unlock supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.915772 | Lon: -4.802844View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.9 km away

CO-Cordoba-013

Del Brillante,81
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 4 plugs
Details
22 kW(Semi-fast)
3.5 km away

E-CO-Cordoba-011

Isla De Tabarca,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.