50 kW• Fast24/7Active in MITECO registry

20XM32T8KK3AR00087

Eess El Resiste - 34120 Carrión De Los, Carrión de los Condes (34120), Palencia, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates42.34131, -4.61720
Official ID2023002779
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Carrión de los Condes, belonging to the province of Palencia (Castilla y León, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002779
Post / EVSE Identifier #1COD20230000014420PR00001637
Post / EVSE Identifier #2ES*ESX*E20XM32T8KK3AR000872
Post / EVSE Identifier #32
Post / EVSE Identifier #4COD20230000014421PR00001638
Post / EVSE Identifier #5ES*ESX*E20XM32T8KK3AR000871
Post / EVSE Identifier #61
Post / EVSE Identifier #7COD20230000014422PR00001639
Post / EVSE Identifier #8ES*ESX*E20XM32T8KK3AR000873
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
🔓Remote plug unlock supported
💳RFID Card / Keyfob reader
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.34131 | Lon: -4.6172View on OpenStreetMap →

Other Nearby Charging Stations

300 kW(Ultra-fast)⛽Estación BP
13.0 km away

Estación bp Villaherreros

Autovia A-231.Burgos-Leon ,Km. 99
Operator:CHARGING TOGETHER SL
CCS Combo 2CHAdeMO
8 points • 12 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.