50 kW• Fast24/7Active in MITECO registry

20XM32T8KK3AR00072

Eme Moron - Calle Moronita, 6, Mairena del Alcor (41530), Sevilla, Spain
Network OperatorENDESA X WAY, S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates37.13024, -5.45318
Official ID2023003984
Official Registry DateApr 23, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Mairena del Alcor, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the ENDESA X WAY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
21.06 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023003984
Post / EVSE Identifier #1COD20230000013805PR00004079
Post / EVSE Identifier #2ES*ESX*E20XM32T8KK3AR000721
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000013806PR00004080
Post / EVSE Identifier #5ES*ESX*E20XM32T8KK3AR000722
Post / EVSE Identifier #62
Post / EVSE Identifier #7COD20230000013807PR00004081
Post / EVSE Identifier #8ES*ESX*E20XM32T8KK3AR000723
Post / EVSE Identifier #93

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported
🔓Remote plug unlock supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.130242 | Lon: -5.453183View on OpenStreetMap →

Other Nearby Charging Stations

200 kW(Ultra-fast)
110 m away

C8A233S023PZWYUJWE

Ronda La Trinidad, 29, 41530 Morón De La Frontera, Sevilla, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2CHAdeMO
1 point • 2 plugs
Details
50 kW(Fast)⛽Estación Repsol
1.6 km away

Repsol ES, CARBURANTES GOSUPLA

Av Alameda, 49
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.