EV Charging Stations in María de Huerva (Zaragoza)
As of 24/10/2026, the municipality of María de Huerva (Zaragoza) has a total of 3 active public charging stations, with 5 dedicated charging bays and 7 connectors in service. Maximum power output reaches 60 kW, with 5 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — María de Huerva
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 5 Dedicated bays
- Active Plugs
- 7 Operational outlets
- Fast Charging
- 5 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 60 kW Peak recorded
Available Connectors in María de Huerva
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 3 plugs |
| Tipo 2 (Mennekes) | 3 plugs |
| CHAdeMO | 1 plug |
Power Distribution in María de Huerva
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 5 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in María de Huerva
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in María de Huerva
Verified specs, connector types and speeds from the official ministry registry
22XP22T3KKJAK00211
Repsol ES, María de Huerva
Frequently Asked Questions in María de Huerva
How many public EV charging points are there in María de Huerva?
María de Huerva currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 7 operational charging plugs.
Are fast charging stations available in María de Huerva?
Yes, María de Huerva features 5 fast and ultra-fast charging plugs (≥43 kW up to 60 kW), suitable for rapid road trip top-ups.
Which charging networks operate in María de Huerva?
Public charging infrastructure in María de Huerva is mainly operated by ENDESA X WAY, S.L., REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to María de Huerva with EV Chargers
Physical proximity calculated via GPS Haversine distance from María de Huerva
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.