EV Charging Stations in Morales de Toro (Zamora)
As of 24/10/2026, the municipality of Morales de Toro (Zamora) has a total of 1 active public charging stations, with 2 dedicated charging bays and 2 connectors in service. Maximum power output reaches 100 kW, with 2 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Morales de Toro
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 2 Dedicated bays
- Active Plugs
- 2 Operational outlets
- Fast Charging
- 2 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 100 kW Peak recorded
Available Connectors in Morales de Toro
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 2 plugs |
Power Distribution in Morales de Toro
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 2 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Morales de Toro
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Morales de Toro
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Morales de Toro
How many public EV charging points are there in Morales de Toro?
Morales de Toro currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.
Are fast charging stations available in Morales de Toro?
Yes, Morales de Toro features 2 fast and ultra-fast charging plugs (≥43 kW up to 100 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Morales de Toro?
Public charging infrastructure in Morales de Toro is mainly operated by ACCIONA Recarga, among other regional networks.
Closest Neighboring Towns to Morales de Toro with EV Chargers
Physical proximity calculated via GPS Haversine distance from Morales de Toro
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.