EV Charging Stations in Tordesillas (Valladolid)

How many EV charging points are there in Tordesillas?

As of 24/10/2026, the municipality of Tordesillas (Valladolid) has a total of 11 active public charging stations, with 98 dedicated charging bays and 111 connectors in service. Maximum power output reaches 360 kW, with 75 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Tordesillas

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
11
Physical locations
Charging Points
98
Dedicated bays
Active Plugs
111
Operational outlets
Fast Charging
17
≥ 43 kW
Ultra-Fast
58
≥ 150 kW
Max Power
360 kW
Peak recorded

Available Connectors in Tordesillas

Charging connectors by type in Tordesillas
Connector TypeActive Plugs
Tipo 2 (Mennekes)46 plugs
CCS Combo 260 plugs
CHAdeMO5 plugs

Power Distribution in Tordesillas

Charging plugs distribution by power in Tordesillas
Power RatingPlugs
Ultra-fast (≥ 150 kW)58 plugs
Fast (43 to 149 kW)17 plugs
Semi-fast (7.4 to 22 kW)32 plugs
Standard (< 7.4 kW)4 plugs

EV Charging Stations Map in Tordesillas

11 stations mapped

Interactive EV Charging Map

11 charging stations ready to explore

All EV Charging Locations in Tordesillas

Verified specs, connector types and speeds from the official ministry registry

7 kW(Standard)✓ Cable24/7

VA-Valladolid-029

Maria De Molina,13
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
100 kW(Fast)⚡ 800V✓ Cable24/7

VA-VALLADOLID-022

España,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CCS Combo 2
10 points • 10 plugs
Details
350 kW(Ultra-fast)⚡ 800V✓ Cable24/7

Tordesillas

Mijo
Operator:IONITY GmbH Sucursal en España
CCS Combo 2
6 points • 6 plugs
Details
250 kW(Ultra-fast)✓ Cable24/7

Tordesillas, Spain

Ctra. Burgos Salamanca, Km 147
Operator:Tesla Spain SLU
CCS Combo 2Tipo 2 (Mennekes)
12 points • 20 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

VA-VALLADOLID-025

Zorrilla,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
50 kW(Fast)✓ Cable24/7

VA-Valladolid-007

Poniente,5
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 5 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, Valdemendral S.L.

Cr A-62 Pk. 147, 00 D
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, Codisoil Tordesillas

Av De Portugal, 7
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
360 kW(Ultra-fast)✓ Cable24/7

WS Tordesillas

Calle Triticale, 2
Operator:Wenea Services Spain, S.L.
CCS Combo 2
32 points • 32 plugs
Details

Frequently Asked Questions in Tordesillas

How many public EV charging points are there in Tordesillas?

Tordesillas currently has 11 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 111 operational charging plugs.

Are fast charging stations available in Tordesillas?

Yes, Tordesillas features 75 fast and ultra-fast charging plugs (≥43 kW up to 360 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Tordesillas?

Public charging infrastructure in Tordesillas is mainly operated by IBERDROLA CLIENTES S.A.U, REPSOL SOLUCIONES ENERGÉTICAS SA, IONITY GmbH Sucursal en España, among other regional networks.

Closest Neighboring Towns to Tordesillas with EV Chargers

Physical proximity calculated via GPS Haversine distance from Tordesillas

All towns in Valladolid
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.