EV Charging Stations in Xeraco (Valencia/València)
As of 24/10/2026, the municipality of Xeraco (Valencia/València) has a total of 4 active public charging stations, with 6 dedicated charging bays and 12 connectors in service. Maximum power output reaches 150 kW, with 4 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Xeraco
Official consolidated metrics from the public MITECO registry
- Stations
- 4 Physical locations
- Charging Points
- 6 Dedicated bays
- Active Plugs
- 12 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 4 ≥ 150 kW
- Max Power
- 150 kW Peak recorded
Available Connectors in Xeraco
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 4 plugs |
| Schuko (Enchufe doméstico) | 4 plugs |
| CCS Combo 2 | 4 plugs |
Power Distribution in Xeraco
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 4 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 4 plugs |
EV Charging Stations Map in Xeraco
4 stations mappedInteractive EV Charging Map
4 charging stations ready to explore
All EV Charging Locations in Xeraco
Verified specs, connector types and speeds from the official ministry registry
Ayuntamiento Xeraco 1
ES_BP_LA SAFOR II
ES_BP_LA SAFOR I
Frequently Asked Questions in Xeraco
How many public EV charging points are there in Xeraco?
Xeraco currently has 4 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 12 operational charging plugs.
Are fast charging stations available in Xeraco?
Yes, Xeraco features 4 fast and ultra-fast charging plugs (≥43 kW up to 150 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Xeraco?
Public charging infrastructure in Xeraco is mainly operated by FENIE ENERGIA, SA, CHARGING TOGETHER SL, among other regional networks.
Closest Neighboring Towns to Xeraco with EV Chargers
Physical proximity calculated via GPS Haversine distance from Xeraco
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.