EV Charging Stations in Godella (Valencia/València)
As of 24/10/2026, the municipality of Godella (Valencia/València) has a total of 1 active public charging stations, with 4 dedicated charging bays and 4 connectors in service. Maximum power output reaches 10 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Godella
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 4 Dedicated bays
- Active Plugs
- 4 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 10 kW Peak recorded
Available Connectors in Godella
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 4 plugs |
Power Distribution in Godella
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Godella
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Godella
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Godella
How many public EV charging points are there in Godella?
Godella currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 4 operational charging plugs.
Are fast charging stations available in Godella?
Currently, charging stations in Godella provide standard and semi-fast charging up to 10 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Godella?
Public charging infrastructure in Godella is mainly operated by IBERDROLA CLIENTES S.A.U, among other regional networks.
Closest Neighboring Towns to Godella with EV Chargers
Physical proximity calculated via GPS Haversine distance from Godella
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.