EV Charging Stations in Alcàntera de Xúquer (Valencia/València)
As of 24/10/2026, the municipality of Alcàntera de Xúquer (Valencia/València) has a total of 2 active public charging stations, with 5 dedicated charging bays and 7 connectors in service. Maximum power output reaches 120 kW, with 2 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Alcàntera de Xúquer
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 5 Dedicated bays
- Active Plugs
- 7 Operational outlets
- Fast Charging
- 2 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 120 kW Peak recorded
Available Connectors in Alcàntera de Xúquer
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 2 plugs |
| Tipo 2 (Mennekes) | 5 plugs |
Power Distribution in Alcàntera de Xúquer
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 2 plugs |
| Semi-fast (7.4 to 22 kW) | 5 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Alcàntera de Xúquer
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Alcàntera de Xúquer
Verified specs, connector types and speeds from the official ministry registry
Seur Valencia
Frequently Asked Questions in Alcàntera de Xúquer
How many public EV charging points are there in Alcàntera de Xúquer?
Alcàntera de Xúquer currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 7 operational charging plugs.
Are fast charging stations available in Alcàntera de Xúquer?
Yes, Alcàntera de Xúquer features 2 fast and ultra-fast charging plugs (≥43 kW up to 120 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Alcàntera de Xúquer?
Public charging infrastructure in Alcàntera de Xúquer is mainly operated by ERANOVUM E-MOBILITY, S.L., REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Alcàntera de Xúquer with EV Chargers
Physical proximity calculated via GPS Haversine distance from Alcàntera de Xúquer
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.