EV Charging Stations in Albaida (Valencia/València)

How many EV charging points are there in Albaida?

As of 24/10/2026, the municipality of Albaida (Valencia/València) has a total of 3 active public charging stations, with 4 dedicated charging bays and 7 connectors in service. Maximum power output reaches 150 kW, with 4 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Albaida

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
3
Physical locations
Charging Points
4
Dedicated bays
Active Plugs
7
Operational outlets
Fast Charging
2
≥ 43 kW
Ultra-Fast
2
≥ 150 kW
Max Power
150 kW
Peak recorded

Available Connectors in Albaida

Charging connectors by type in Albaida
Connector TypeActive Plugs
CCS Combo 24 plugs
Tipo 2 (Mennekes)3 plugs

Power Distribution in Albaida

Charging plugs distribution by power in Albaida
Power RatingPlugs
Ultra-fast (≥ 150 kW)2 plugs
Fast (43 to 149 kW)2 plugs
Semi-fast (7.4 to 22 kW)3 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Albaida

3 stations mapped

Interactive EV Charging Map

3 charging stations ready to explore

All EV Charging Locations in Albaida

Verified specs, connector types and speeds from the official ministry registry

120 kW(Fast)⚡ 800V✓ Cable🛒Supermercado ConsumHorario habitual

CONSUM ALBAIDA

Avd. de la Fira, 25
Operator:REMO SUSTAINABLE MOBILITY S.L
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
22 kW(Semi-fast)24/7

E-V-Albaida-001

De Josep Giner I Marco (Pg Laberinto),5
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
150 kW(Ultra-fast)⚡ 800V✓ Cable🛒Supermercado AldiHorario habitual

ALDI ALBAIDA

Av. de Josep Giner i Marco
Operator:REMO SUSTAINABLE MOBILITY S.L
CCS Combo 2
1 point • 2 plugs
Details

Frequently Asked Questions in Albaida

How many public EV charging points are there in Albaida?

Albaida currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 7 operational charging plugs.

Are fast charging stations available in Albaida?

Yes, Albaida features 4 fast and ultra-fast charging plugs (≥43 kW up to 150 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Albaida?

Public charging infrastructure in Albaida is mainly operated by REMO SUSTAINABLE MOBILITY S.L, IBERDROLA CLIENTES S.A.U, among other regional networks.

Closest Neighboring Towns to Albaida with EV Chargers

Physical proximity calculated via GPS Haversine distance from Albaida

All towns in Valencia/València
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.