EV Charging Stations in Camuñas (Toledo)
As of 24/10/2026, the municipality of Camuñas (Toledo) has a total of 3 active public charging stations, with 8 dedicated charging bays and 8 connectors in service. Maximum power output reaches 150 kW, with 8 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Camuñas
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 8 Dedicated bays
- Active Plugs
- 8 Operational outlets
- Fast Charging
- 6 ≥ 43 kW
- Ultra-Fast
- 2 ≥ 150 kW
- Max Power
- 150 kW Peak recorded
Available Connectors in Camuñas
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 4 plugs |
| CHAdeMO | 2 plugs |
| Tipo 2 (Mennekes) | 2 plugs |
Power Distribution in Camuñas
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 2 plugs |
| Fast (43 to 149 kW) | 6 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Camuñas
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Camuñas
Verified specs, connector types and speeds from the official ministry registry
62108004710012
62108004710003
Frequently Asked Questions in Camuñas
How many public EV charging points are there in Camuñas?
Camuñas currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 8 operational charging plugs.
Are fast charging stations available in Camuñas?
Yes, Camuñas features 8 fast and ultra-fast charging plugs (≥43 kW up to 150 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Camuñas?
Public charging infrastructure in Camuñas is mainly operated by ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Camuñas with EV Chargers
Physical proximity calculated via GPS Haversine distance from Camuñas
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.