EV Charging Stations in Gines (Sevilla)
As of 24/10/2026, the municipality of Gines (Sevilla) has a total of 7 active public charging stations, with 16 dedicated charging bays and 19 connectors in service. Maximum power output reaches 150 kW, with 9 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Gines
Official consolidated metrics from the public MITECO registry
- Stations
- 7 Physical locations
- Charging Points
- 16 Dedicated bays
- Active Plugs
- 19 Operational outlets
- Fast Charging
- 7 ≥ 43 kW
- Ultra-Fast
- 2 ≥ 150 kW
- Max Power
- 150 kW Peak recorded
Available Connectors in Gines
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 12 plugs |
| CCS Combo 2 | 5 plugs |
| CHAdeMO | 2 plugs |
Power Distribution in Gines
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 2 plugs |
| Fast (43 to 149 kW) | 7 plugs |
| Semi-fast (7.4 to 22 kW) | 10 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Gines
7 stations mappedInteractive EV Charging Map
7 charging stations ready to explore
All EV Charging Locations in Gines
Verified specs, connector types and speeds from the official ministry registry
E-SE-Gines-001
61945049570016
61949051030018
C6E15BCC21KAPGHAJX
Repsol ES, CRED Gines
Burger King - Gines
Frequently Asked Questions in Gines
How many public EV charging points are there in Gines?
Gines currently has 7 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 19 operational charging plugs.
Are fast charging stations available in Gines?
Yes, Gines features 9 fast and ultra-fast charging plugs (≥43 kW up to 150 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Gines?
Public charging infrastructure in Gines is mainly operated by ENDESA X WAY, S.L., PLENOIL, S.L., IBERDROLA CLIENTES S.A.U, among other regional networks.
Nearby Municipalities with EV Chargers in Sevilla
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.