EV Charging Stations in Maderuelo (Segovia)
As of 24/10/2026, the municipality of Maderuelo (Segovia) has a total of 2 active public charging stations, with 4 dedicated charging bays and 4 connectors in service. Maximum power output reaches 22 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Maderuelo
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 4 Dedicated bays
- Active Plugs
- 4 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 22 kW Peak recorded
Available Connectors in Maderuelo
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 4 plugs |
Power Distribution in Maderuelo
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Maderuelo
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Maderuelo
Verified specs, connector types and speeds from the official ministry registry
21XP22T3KKJAK00571
Frequently Asked Questions in Maderuelo
How many public EV charging points are there in Maderuelo?
Maderuelo currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 4 operational charging plugs.
Are fast charging stations available in Maderuelo?
Currently, charging stations in Maderuelo provide standard and semi-fast charging up to 22 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Maderuelo?
Public charging infrastructure in Maderuelo is mainly operated by ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Maderuelo with EV Chargers
Physical proximity calculated via GPS Haversine distance from Maderuelo
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.