EV Charging Stations in Viana do Bolo (Ourense)
As of 24/10/2026, the municipality of Viana do Bolo (Ourense) has a total of 2 active public charging stations, with 4 dedicated charging bays and 4 connectors in service. Maximum power output reaches 22 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Viana do Bolo
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 4 Dedicated bays
- Active Plugs
- 4 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 22 kW Peak recorded
Available Connectors in Viana do Bolo
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 4 plugs |
Power Distribution in Viana do Bolo
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Viana do Bolo
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Viana do Bolo
Verified specs, connector types and speeds from the official ministry registry
24XP22T3QQJAN01183
Frequently Asked Questions in Viana do Bolo
How many public EV charging points are there in Viana do Bolo?
Viana do Bolo currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 4 operational charging plugs.
Are fast charging stations available in Viana do Bolo?
Currently, charging stations in Viana do Bolo provide standard and semi-fast charging up to 22 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Viana do Bolo?
Public charging infrastructure in Viana do Bolo is mainly operated by ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Viana do Bolo with EV Chargers
Physical proximity calculated via GPS Haversine distance from Viana do Bolo
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.