EV Charging Stations in Trasmiras (Ourense)
As of 24/10/2026, the municipality of Trasmiras (Ourense) has a total of 1 active public charging stations, with 1 dedicated charging bays and 3 connectors in service. Maximum power output reaches 50 kW, with 3 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Trasmiras
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 1 Dedicated bays
- Active Plugs
- 3 Operational outlets
- Fast Charging
- 3 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 50 kW Peak recorded
Available Connectors in Trasmiras
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 1 plug |
| CCS Combo 2 | 1 plug |
| CHAdeMO | 1 plug |
Power Distribution in Trasmiras
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 3 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Trasmiras
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Trasmiras
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Trasmiras
How many public EV charging points are there in Trasmiras?
Trasmiras currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 3 operational charging plugs.
Are fast charging stations available in Trasmiras?
Yes, Trasmiras features 3 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Trasmiras?
Public charging infrastructure in Trasmiras is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Trasmiras with EV Chargers
Physical proximity calculated via GPS Haversine distance from Trasmiras
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.