EV Charging Stations in Gudiña, A (Ourense)
As of 24/10/2026, the municipality of Gudiña, A (Ourense) has a total of 1 active public charging stations, with 10 dedicated charging bays and 10 connectors in service. Maximum power output reaches 400 kW, with 10 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Gudiña, A
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 10 Dedicated bays
- Active Plugs
- 10 Operational outlets
- Fast Charging
- 2 ≥ 43 kW
- Ultra-Fast
- 8 ≥ 150 kW
- Max Power
- 400 kW Peak recorded
Available Connectors in Gudiña, A
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 10 plugs |
Power Distribution in Gudiña, A
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 8 plugs |
| Fast (43 to 149 kW) | 2 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Gudiña, A
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Gudiña, A
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Gudiña, A
How many public EV charging points are there in Gudiña, A?
Gudiña, A currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 10 operational charging plugs.
Are fast charging stations available in Gudiña, A?
Yes, Gudiña, A features 10 fast and ultra-fast charging plugs (≥43 kW up to 400 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Gudiña, A?
Public charging infrastructure in Gudiña, A is mainly operated by CHARGING TOGETHER SL, among other regional networks.
Closest Neighboring Towns to Gudiña, A with EV Chargers
Physical proximity calculated via GPS Haversine distance from Gudiña, A
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.