EV Charging Stations in Cascante (Navarra)
As of 24/10/2026, the municipality of Cascante (Navarra) has a total of 3 active public charging stations, with 6 dedicated charging bays and 9 connectors in service. Maximum power output reaches 180 kW, with 9 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Cascante
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 6 Dedicated bays
- Active Plugs
- 9 Operational outlets
- Fast Charging
- 5 ≥ 43 kW
- Ultra-Fast
- 4 ≥ 150 kW
- Max Power
- 180 kW Peak recorded
Available Connectors in Cascante
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 6 plugs |
| Tipo 2 (Mennekes) | 2 plugs |
| CHAdeMO | 1 plug |
Power Distribution in Cascante
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 4 plugs |
| Fast (43 to 149 kW) | 5 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Cascante
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Cascante
Verified specs, connector types and speeds from the official ministry registry
CASCANTE
Repsol ES, CRED Cascante
Frequently Asked Questions in Cascante
How many public EV charging points are there in Cascante?
Cascante currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 9 operational charging plugs.
Are fast charging stations available in Cascante?
Yes, Cascante features 9 fast and ultra-fast charging plugs (≥43 kW up to 180 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Cascante?
Public charging infrastructure in Cascante is mainly operated by CHARGING TOGETHER SL, Energía Distribuida del Norte S.A., REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Cascante with EV Chargers
Physical proximity calculated via GPS Haversine distance from Cascante
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.