EV Charging Stations in Andosilla (Navarra)
As of 24/10/2026, the municipality of Andosilla (Navarra) has a total of 1 active public charging stations, with 1 dedicated charging bays and 2 connectors in service. Maximum power output reaches 50 kW, with 2 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Andosilla
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 1 Dedicated bays
- Active Plugs
- 2 Operational outlets
- Fast Charging
- 2 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 50 kW Peak recorded
Available Connectors in Andosilla
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 1 plug |
| CCS Combo 2 | 1 plug |
Power Distribution in Andosilla
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 2 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Andosilla
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Andosilla
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Andosilla
How many public EV charging points are there in Andosilla?
Andosilla currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.
Are fast charging stations available in Andosilla?
Yes, Andosilla features 2 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Andosilla?
Public charging infrastructure in Andosilla is mainly operated by Energía Distribuida del Norte S.A., among other regional networks.
Closest Neighboring Towns to Andosilla with EV Chargers
Physical proximity calculated via GPS Haversine distance from Andosilla
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.