EV Charging Stations in Aranjuez (Madrid)

How many EV charging points are there in Aranjuez?

As of 24/10/2026, the municipality of Aranjuez (Madrid) has a total of 11 active public charging stations, with 34 dedicated charging bays and 35 connectors in service. Maximum power output reaches 150 kW, with 9 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Aranjuez

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
11
Physical locations
Charging Points
34
Dedicated bays
Active Plugs
35
Operational outlets
Fast Charging
8
≥ 43 kW
Ultra-Fast
1
≥ 150 kW
Max Power
150 kW
Peak recorded

Available Connectors in Aranjuez

Charging connectors by type in Aranjuez
Connector TypeActive Plugs
CHAdeMO4 plugs
CCS Combo 24 plugs
Tipo 2 (Mennekes)27 plugs

Power Distribution in Aranjuez

Charging plugs distribution by power in Aranjuez
Power RatingPlugs
Ultra-fast (≥ 150 kW)1 plugs
Fast (43 to 149 kW)8 plugs
Semi-fast (7.4 to 22 kW)26 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Aranjuez

11 stations mapped

Interactive EV Charging Map

11 charging stations ready to explore

All EV Charging Locations in Aranjuez

Verified specs, connector types and speeds from the official ministry registry

22 kW(Semi-fast)24/7

AhorraMas Aranjuez

Glorieta De La Musica
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

Hosp. del Tajo

Av. Amazonas Central, S/N
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
14 points • 14 plugs
Details
90 kW(Fast)⚡ 800V✓ CableHorario habitual

Gasolinera E.leclerc Moreras

C. De Las Moreras, 62, 28300 Aranjuez, Madrid
Operator:Punto Recargas SL
CCS Combo 2CHAdeMO
2 points • 2 plugs
Details
22 kW(Semi-fast)Horario habitual

E-M-Aranjuez-001

De Almansa,17
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)✓ Cable24/7

62050043020001

Mcdonalds - C. Del Fresno, 10, 28300
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
11 kW(Semi-fast)24/7

21XP22T3KKJAK00548

Pl. De La Unesco, 2, 28300 Madrid, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
11 kW(Semi-fast)24/7

21XP22T3KKJAK00544

Pl. De La Unesco, 2, 28300 Aranjuez, Madrid,
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
150 kW(Ultra-fast)⚡ 800V✓ CableHorario habitual

E.Leclerc - Gasolinera Moreras

C. De Las Moreras, 62, 28300 Aranjuez, Madrid
Operator:Punto Recargas SL
CCS Combo 2CHAdeMO
2 points • 2 plugs
Details
22 kW(Semi-fast)✓ Cable24/7

M-Aranjuez-001

Gonzalo Chacon,27
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)✓ Cable24/7

Indra Aranjuez

Calle Joaquín Rodrigo, 11
Operator:Wenea Services Spain, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details

Frequently Asked Questions in Aranjuez

How many public EV charging points are there in Aranjuez?

Aranjuez currently has 11 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 35 operational charging plugs.

Are fast charging stations available in Aranjuez?

Yes, Aranjuez features 9 fast and ultra-fast charging plugs (≥43 kW up to 150 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Aranjuez?

Public charging infrastructure in Aranjuez is mainly operated by ENDESA X WAY, S.L., Punto Recargas SL, IBERDROLA CLIENTES S.A.U, among other regional networks.

Closest Neighboring Towns to Aranjuez with EV Chargers

Physical proximity calculated via GPS Haversine distance from Aranjuez

All towns in Madrid
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.