EV Charging Stations in Burela (Lugo)

How many EV charging points are there in Burela?

As of 24/10/2026, the municipality of Burela (Lugo) has a total of 1 active public charging stations, with 1 dedicated charging bays and 3 connectors in service. Maximum power output reaches 50 kW, with 2 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Burela

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
1
Dedicated bays
Active Plugs
3
Operational outlets
Fast Charging
2
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Burela

Charging connectors by type in Burela
Connector TypeActive Plugs
CCS Combo 21 plug
CHAdeMO1 plug
Tipo 2 (Mennekes)1 plug

Power Distribution in Burela

Charging plugs distribution by power in Burela
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)2 plugs
Semi-fast (7.4 to 22 kW)1 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Burela

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Burela

Verified specs, connector types and speeds from the official ministry registry

50 kW(Fast)✓ Cable🛒EroskiHorario habitual

EROSKI BURELA

Lugar, Av. do Perdouro,13
Operator:ENERGEA CONSULTING Y ASESORES SL
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
1 point • 3 plugs
Details

Frequently Asked Questions in Burela

How many public EV charging points are there in Burela?

Burela currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 3 operational charging plugs.

Are fast charging stations available in Burela?

Yes, Burela features 2 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Burela?

Public charging infrastructure in Burela is mainly operated by ENERGEA CONSULTING Y ASESORES SL, among other regional networks.

Closest Neighboring Towns to Burela with EV Chargers

Physical proximity calculated via GPS Haversine distance from Burela

All towns in Lugo
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.