EV Charging Stations in Anglesola (Lleida)
As of 24/10/2026, the municipality of Anglesola (Lleida) has a total of 1 active public charging stations, with 2 dedicated charging bays and 2 connectors in service. Maximum power output reaches 25 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Anglesola
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 2 Dedicated bays
- Active Plugs
- 2 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 25 kW Peak recorded
Available Connectors in Anglesola
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 2 plugs |
Power Distribution in Anglesola
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Anglesola
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Anglesola
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Anglesola
How many public EV charging points are there in Anglesola?
Anglesola currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.
Are fast charging stations available in Anglesola?
Currently, charging stations in Anglesola provide standard and semi-fast charging up to 25 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Anglesola?
Public charging infrastructure in Anglesola is mainly operated by CHARGING TOGETHER SL, among other regional networks.
Closest Neighboring Towns to Anglesola with EV Chargers
Physical proximity calculated via GPS Haversine distance from Anglesola
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.