EV Charging Stations in Felanitx (Balears, Illes)

How many EV charging points are there in Felanitx?

As of 24/10/2026, the municipality of Felanitx (Balears, Illes) has a total of 14 active public charging stations, with 15 dedicated charging bays and 27 connectors in service. Maximum power output reaches 50 kW, with 2 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Felanitx

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
14
Physical locations
Charging Points
15
Dedicated bays
Active Plugs
27
Operational outlets
Fast Charging
2
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Felanitx

Charging connectors by type in Felanitx
Connector TypeActive Plugs
Tipo 2 (Mennekes)25 plugs
CCS Combo 22 plugs

Power Distribution in Felanitx

Charging plugs distribution by power in Felanitx
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)2 plugs
Semi-fast (7.4 to 22 kW)25 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Felanitx

14 stations mapped

Interactive EV Charging Map

14 charging stations ready to explore

All EV Charging Locations in Felanitx

Verified specs, connector types and speeds from the official ministry registry

11 kW(Semi-fast)24/7

BRIGADA MUNICIPAL

C/ SANT PERE, 6
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

CALA FERRERA PONENT

AV. FELANITX, 2
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

CALA FERRERA BLANCA

C/ SA PARTIÓ, 2
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

PARC MUNICIPAL

C/ANGLASOLA, 39
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

31 DE MARÇ

C/ 31 DE MARÇ, 1/3
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
7.4 kW(Semi-fast)24/7

AJUNTAMENT

PLAÇA CONSTITUCIÓ, 1
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 1 plug
Details
11 kW(Semi-fast)24/7

S'HORTA

PLAÇA SANT ISIDRE, 6
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

CENTRE CIVIC ES PORT

RONDA NADAL BATLE, S/N
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

CAS CONCOS

PLAÇA ESGLESIA, 18
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

GUILLEM TIMONER 2

POLIESPORTIU GUILLEM TIMONER, Ctra. Felanitx-Campos
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

GUILLEM TIMONER 1

POLIESPORTIU GUILLEM TIMONER, Ctra. Felanitx-Campos
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

AUDITORI

PASSEIG RAMON LLULL, 25
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
11 kW(Semi-fast)24/7

ES TORRENTÓ

CAMP DE FUTBOL ES TORRENTÓ - MARIONA CALDENTEY, Ctra. Felanitx-Portocolom, km 0.5
Operator:AYUNTAMIENTO DE FELANITX
Tipo 2 (Mennekes)
1 point • 2 plugs
Details

Frequently Asked Questions in Felanitx

How many public EV charging points are there in Felanitx?

Felanitx currently has 14 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 27 operational charging plugs.

Are fast charging stations available in Felanitx?

Yes, Felanitx features 2 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Felanitx?

Public charging infrastructure in Felanitx is mainly operated by AYUNTAMIENTO DE FELANITX, TotalEnergies Charging Services España, SLU, among other regional networks.

Closest Neighboring Towns to Felanitx with EV Chargers

Physical proximity calculated via GPS Haversine distance from Felanitx

All towns in Balears, Illes
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.