EV Charging Stations in San Clemente (Cuenca)
As of 24/10/2026, the municipality of San Clemente (Cuenca) has a total of 1 active public charging stations, with 4 dedicated charging bays and 4 connectors in service. Maximum power output reaches 22.17 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — San Clemente
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 4 Dedicated bays
- Active Plugs
- 4 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 22.17 kW Peak recorded
Available Connectors in San Clemente
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 4 plugs |
Power Distribution in San Clemente
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 4 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in San Clemente
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in San Clemente
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in San Clemente
How many public EV charging points are there in San Clemente?
San Clemente currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 4 operational charging plugs.
Are fast charging stations available in San Clemente?
Currently, charging stations in San Clemente provide standard and semi-fast charging up to 22.17 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in San Clemente?
Public charging infrastructure in San Clemente is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to San Clemente with EV Chargers
Physical proximity calculated via GPS Haversine distance from San Clemente
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.