EV Charging Stations in Priego (Cuenca)

How many EV charging points are there in Priego?

As of 24/10/2026, the municipality of Priego (Cuenca) has a total of 1 active public charging stations, with 2 dedicated charging bays and 2 connectors in service. Maximum power output reaches 20 kW, with 0 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Priego

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
2
Dedicated bays
Active Plugs
2
Operational outlets
Fast Charging
0
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
20 kW
Peak recorded

Available Connectors in Priego

Charging connectors by type in Priego
Connector TypeActive Plugs
Tipo 2 (Mennekes)2 plugs
Operators in Priego:

Power Distribution in Priego

Charging plugs distribution by power in Priego
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)0 plugs
Semi-fast (7.4 to 22 kW)2 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Priego

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Priego

Verified specs, connector types and speeds from the official ministry registry

20 kW(Semi-fast)✓ Cable24/7

CU-PRIEGO-001

Gorgonio De La Llana,7
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details

Frequently Asked Questions in Priego

How many public EV charging points are there in Priego?

Priego currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.

Are fast charging stations available in Priego?

Currently, charging stations in Priego provide standard and semi-fast charging up to 20 kW, ideal for hotel, shopping and destination charging.

Which charging networks operate in Priego?

Public charging infrastructure in Priego is mainly operated by IBERDROLA CLIENTES S.A.U, among other regional networks.

Closest Neighboring Towns to Priego with EV Chargers

Physical proximity calculated via GPS Haversine distance from Priego

All towns in Cuenca
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.