EV Charging Stations in Pedro Muñoz (Ciudad Real)
As of 24/10/2026, the municipality of Pedro Muñoz (Ciudad Real) has a total of 2 active public charging stations, with 5 dedicated charging bays and 5 connectors in service. Maximum power output reaches 50 kW, with 3 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Pedro Muñoz
Official consolidated metrics from the public MITECO registry
- Stations
- 2 Physical locations
- Charging Points
- 5 Dedicated bays
- Active Plugs
- 5 Operational outlets
- Fast Charging
- 3 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 50 kW Peak recorded
Available Connectors in Pedro Muñoz
| Connector Type | Active Plugs |
|---|---|
| CCS Combo 2 | 1 plug |
| CHAdeMO | 1 plug |
| Tipo 2 (Mennekes) | 3 plugs |
Power Distribution in Pedro Muñoz
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 3 plugs |
| Semi-fast (7.4 to 22 kW) | 2 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Pedro Muñoz
2 stations mappedInteractive EV Charging Map
2 charging stations ready to explore
All EV Charging Locations in Pedro Muñoz
Verified specs, connector types and speeds from the official ministry registry
21XP22T3KK4AL00181
Frequently Asked Questions in Pedro Muñoz
How many public EV charging points are there in Pedro Muñoz?
Pedro Muñoz currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 5 operational charging plugs.
Are fast charging stations available in Pedro Muñoz?
Yes, Pedro Muñoz features 3 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Pedro Muñoz?
Public charging infrastructure in Pedro Muñoz is mainly operated by ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Pedro Muñoz with EV Chargers
Physical proximity calculated via GPS Haversine distance from Pedro Muñoz
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.