EV Charging Stations in Pedro Muñoz (Ciudad Real)

How many EV charging points are there in Pedro Muñoz?

As of 24/10/2026, the municipality of Pedro Muñoz (Ciudad Real) has a total of 2 active public charging stations, with 5 dedicated charging bays and 5 connectors in service. Maximum power output reaches 50 kW, with 3 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Pedro Muñoz

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
2
Physical locations
Charging Points
5
Dedicated bays
Active Plugs
5
Operational outlets
Fast Charging
3
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Pedro Muñoz

Charging connectors by type in Pedro Muñoz
Connector TypeActive Plugs
CCS Combo 21 plug
CHAdeMO1 plug
Tipo 2 (Mennekes)3 plugs
Operators in Pedro Muñoz:

Power Distribution in Pedro Muñoz

Charging plugs distribution by power in Pedro Muñoz
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)3 plugs
Semi-fast (7.4 to 22 kW)2 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Pedro Muñoz

2 stations mapped

Interactive EV Charging Map

2 charging stations ready to explore

All EV Charging Locations in Pedro Muñoz

Verified specs, connector types and speeds from the official ministry registry

50 kW(Fast)✓ Cable24/7

20XM32T8KK4AR00074

Av. Juan Carlos I, 99, 13620 Pedro Muñoz,
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
22 kW(Semi-fast)🛒Supermercado Consum24/7

21XP22T3KK4AL00181

Consum - Av. Juan Carlos I, 87, 13620 Pedro
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details

Frequently Asked Questions in Pedro Muñoz

How many public EV charging points are there in Pedro Muñoz?

Pedro Muñoz currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 5 operational charging plugs.

Are fast charging stations available in Pedro Muñoz?

Yes, Pedro Muñoz features 3 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Pedro Muñoz?

Public charging infrastructure in Pedro Muñoz is mainly operated by ENDESA X WAY, S.L., among other regional networks.

Closest Neighboring Towns to Pedro Muñoz with EV Chargers

Physical proximity calculated via GPS Haversine distance from Pedro Muñoz

All towns in Ciudad Real
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.