EV Charging Stations in Sot de Ferrer (Castellón/Castelló)

How many EV charging points are there in Sot de Ferrer?

As of 24/10/2026, the municipality of Sot de Ferrer (Castellón/Castelló) has a total of 1 active public charging stations, with 1 dedicated charging bays and 3 connectors in service. Maximum power output reaches 50 kW, with 3 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Sot de Ferrer

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
1
Dedicated bays
Active Plugs
3
Operational outlets
Fast Charging
3
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Sot de Ferrer

Charging connectors by type in Sot de Ferrer
Connector TypeActive Plugs
Tipo 2 (Mennekes)1 plug
CCS Combo 21 plug
CHAdeMO1 plug
Operators in Sot de Ferrer:

Power Distribution in Sot de Ferrer

Charging plugs distribution by power in Sot de Ferrer
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)3 plugs
Semi-fast (7.4 to 22 kW)0 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Sot de Ferrer

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Sot de Ferrer

Verified specs, connector types and speeds from the official ministry registry

Frequently Asked Questions in Sot de Ferrer

How many public EV charging points are there in Sot de Ferrer?

Sot de Ferrer currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 3 operational charging plugs.

Are fast charging stations available in Sot de Ferrer?

Yes, Sot de Ferrer features 3 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Sot de Ferrer?

Public charging infrastructure in Sot de Ferrer is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.

Closest Neighboring Towns to Sot de Ferrer with EV Chargers

Physical proximity calculated via GPS Haversine distance from Sot de Ferrer

All towns in Castellón/Castelló
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.