EV Charging Stations in Herrerías (Cantabria)

How many EV charging points are there in Herrerías?

As of 24/10/2026, the municipality of Herrerías (Cantabria) has a total of 1 active public charging stations, with 1 dedicated charging bays and 3 connectors in service. Maximum power output reaches 50 kW, with 3 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Herrerías

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
1
Dedicated bays
Active Plugs
3
Operational outlets
Fast Charging
3
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
50 kW
Peak recorded

Available Connectors in Herrerías

Charging connectors by type in Herrerías
Connector TypeActive Plugs
CHAdeMO1 plug
CCS Combo 21 plug
Tipo 2 (Mennekes)1 plug
Operators in Herrerías:

Power Distribution in Herrerías

Charging plugs distribution by power in Herrerías
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)3 plugs
Semi-fast (7.4 to 22 kW)0 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Herrerías

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Herrerías

Verified specs, connector types and speeds from the official ministry registry

50 kW(Fast)✓ Cable24/7

El Pindal 2

Cruce De Pechón 5
Operator:EDP CLIENTES SAU
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details

Frequently Asked Questions in Herrerías

How many public EV charging points are there in Herrerías?

Herrerías currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 3 operational charging plugs.

Are fast charging stations available in Herrerías?

Yes, Herrerías features 3 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Herrerías?

Public charging infrastructure in Herrerías is mainly operated by EDP CLIENTES SAU, among other regional networks.

Closest Neighboring Towns to Herrerías with EV Chargers

Physical proximity calculated via GPS Haversine distance from Herrerías

All towns in Cantabria
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.