EV Charging Stations in Almaraz (Cáceres)

How many EV charging points are there in Almaraz?

As of 24/10/2026, the municipality of Almaraz (Cáceres) has a total of 2 active public charging stations, with 18 dedicated charging bays and 28 connectors in service. Maximum power output reaches 300 kW, with 28 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Almaraz

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
2
Physical locations
Charging Points
18
Dedicated bays
Active Plugs
28
Operational outlets
Fast Charging
0
≥ 43 kW
Ultra-Fast
28
≥ 150 kW
Max Power
300 kW
Peak recorded

Available Connectors in Almaraz

Charging connectors by type in Almaraz
Connector TypeActive Plugs
CCS Combo 218 plugs
Tipo 2 (Mennekes)10 plugs

Power Distribution in Almaraz

Charging plugs distribution by power in Almaraz
Power RatingPlugs
Ultra-fast (≥ 150 kW)28 plugs
Fast (43 to 149 kW)0 plugs
Semi-fast (7.4 to 22 kW)0 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Almaraz

2 stations mapped

Interactive EV Charging Map

2 charging stations ready to explore

All EV Charging Locations in Almaraz

Verified specs, connector types and speeds from the official ministry registry

150 kW(Ultra-fast)✓ Cable24/7

Almaraz, Spain

Km 200
Operator:Tesla Spain SLU
Tipo 2 (Mennekes)CCS Combo 2
10 points • 20 plugs
Details

Frequently Asked Questions in Almaraz

How many public EV charging points are there in Almaraz?

Almaraz currently has 2 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 28 operational charging plugs.

Are fast charging stations available in Almaraz?

Yes, Almaraz features 28 fast and ultra-fast charging plugs (≥43 kW up to 300 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Almaraz?

Public charging infrastructure in Almaraz is mainly operated by (ZUNDER) Grupo Easychargar SA, Tesla Spain SLU, among other regional networks.

Closest Neighboring Towns to Almaraz with EV Chargers

Physical proximity calculated via GPS Haversine distance from Almaraz

All towns in Cáceres
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.