EV Charging Stations in Arlanzón (Burgos)

How many EV charging points are there in Arlanzón?

As of 24/10/2026, the municipality of Arlanzón (Burgos) has a total of 4 active public charging stations, with 22 dedicated charging bays and 29 connectors in service. Maximum power output reaches 150 kW, with 17 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Arlanzón

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
4
Physical locations
Charging Points
22
Dedicated bays
Active Plugs
29
Operational outlets
Fast Charging
14
≥ 43 kW
Ultra-Fast
3
≥ 150 kW
Max Power
150 kW
Peak recorded

Available Connectors in Arlanzón

Charging connectors by type in Arlanzón
Connector TypeActive Plugs
Tipo 2 (Mennekes)13 plugs
CHAdeMO7 plugs
CCS Combo 29 plugs

Power Distribution in Arlanzón

Charging plugs distribution by power in Arlanzón
Power RatingPlugs
Ultra-fast (≥ 150 kW)3 plugs
Fast (43 to 149 kW)14 plugs
Semi-fast (7.4 to 22 kW)2 plugs
Standard (< 7.4 kW)10 plugs

EV Charging Stations Map in Arlanzón

4 stations mapped

Interactive EV Charging Map

4 charging stations ready to explore

All EV Charging Locations in Arlanzón

Verified specs, connector types and speeds from the official ministry registry

150 kW(Ultra-fast)⚡ 800V✓ Cable🏨Hotel / Alojamiento24/7

Hotel Ciudad de Burgos

N-I,Km 249
Operator:CHARGING TOGETHER SL
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
8 points • 14 plugs
Details
7.36 kW(Standard)24/7

E-BU-Rubena-001

N-I,249
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
10 points • 10 plugs
Details
50 kW(Fast)✓ Cable⛽Estación Repsol24/7

Repsol ES, CRED Cardeñajimeno

Ctra. N-120 (Logroño-Vigo), Km 106
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
100 kW(Fast)✓ Cable24/7

E.S. Beroil Rubena

N-1, Km 247
Operator:Wenea Services Spain, S.L.
CCS Combo 2
2 points • 2 plugs
Details

Frequently Asked Questions in Arlanzón

How many public EV charging points are there in Arlanzón?

Arlanzón currently has 4 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 29 operational charging plugs.

Are fast charging stations available in Arlanzón?

Yes, Arlanzón features 17 fast and ultra-fast charging plugs (≥43 kW up to 150 kW), suitable for rapid road trip top-ups.

Which charging networks operate in Arlanzón?

Public charging infrastructure in Arlanzón is mainly operated by CHARGING TOGETHER SL, IBERDROLA CLIENTES S.A.U, REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.

Closest Neighboring Towns to Arlanzón with EV Chargers

Physical proximity calculated via GPS Haversine distance from Arlanzón

All towns in Burgos
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.