EV Charging Stations in Maruri-Jatabe (Bizkaia)
As of 24/10/2026, the municipality of Maruri-Jatabe (Bizkaia) has a total of 1 active public charging stations, with 2 dedicated charging bays and 2 connectors in service. Maximum power output reaches 7.36 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Maruri-Jatabe
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 2 Dedicated bays
- Active Plugs
- 2 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 7.36 kW Peak recorded
Available Connectors in Maruri-Jatabe
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 2 plugs |
Power Distribution in Maruri-Jatabe
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 2 plugs |
EV Charging Stations Map in Maruri-Jatabe
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Maruri-Jatabe
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Maruri-Jatabe
How many public EV charging points are there in Maruri-Jatabe?
Maruri-Jatabe currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.
Are fast charging stations available in Maruri-Jatabe?
Currently, charging stations in Maruri-Jatabe provide standard and semi-fast charging up to 7.36 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Maruri-Jatabe?
Public charging infrastructure in Maruri-Jatabe is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.
Closest Neighboring Towns to Maruri-Jatabe with EV Chargers
Physical proximity calculated via GPS Haversine distance from Maruri-Jatabe
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.