EV Charging Stations in Malla (Barcelona)
As of 24/10/2026, the municipality of Malla (Barcelona) has a total of 3 active public charging stations, with 21 dedicated charging bays and 36 connectors in service. Maximum power output reaches 160 kW, with 3 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Malla
Official consolidated metrics from the public MITECO registry
- Stations
- 3 Physical locations
- Charging Points
- 21 Dedicated bays
- Active Plugs
- 36 Operational outlets
- Fast Charging
- 1 ≥ 43 kW
- Ultra-Fast
- 2 ≥ 150 kW
- Max Power
- 160 kW Peak recorded
Available Connectors in Malla
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 33 plugs |
| CHAdeMO | 2 plugs |
| CCS Combo 2 | 1 plug |
Power Distribution in Malla
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 2 plugs |
| Fast (43 to 149 kW) | 1 plugs |
| Semi-fast (7.4 to 22 kW) | 33 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Malla
3 stations mappedInteractive EV Charging Map
3 charging stations ready to explore
All EV Charging Locations in Malla
Verified specs, connector types and speeds from the official ministry registry
9002 - Malla
9002-Malla
Frequently Asked Questions in Malla
How many public EV charging points are there in Malla?
Malla currently has 3 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 36 operational charging plugs.
Are fast charging stations available in Malla?
Yes, Malla features 3 fast and ultra-fast charging plugs (≥43 kW up to 160 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Malla?
Public charging infrastructure in Malla is mainly operated by BONPREU, S.A.U., Etecnic Movilidad Electrica, SRL, among other regional networks.
Closest Neighboring Towns to Malla with EV Chargers
Physical proximity calculated via GPS Haversine distance from Malla
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.