EV Charging Stations in Dosrius (Barcelona)
As of 24/10/2026, the municipality of Dosrius (Barcelona) has a total of 1 active public charging stations, with 3 dedicated charging bays and 3 connectors in service. Maximum power output reaches 50 kW, with 3 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Dosrius
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 3 Dedicated bays
- Active Plugs
- 3 Operational outlets
- Fast Charging
- 3 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 50 kW Peak recorded
Available Connectors in Dosrius
| Connector Type | Active Plugs |
|---|---|
| CHAdeMO | 1 plug |
| Tipo 2 (Mennekes) | 1 plug |
| CCS Combo 2 | 1 plug |
Power Distribution in Dosrius
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 3 plugs |
| Semi-fast (7.4 to 22 kW) | 0 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Dosrius
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Dosrius
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Dosrius
How many public EV charging points are there in Dosrius?
Dosrius currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 3 operational charging plugs.
Are fast charging stations available in Dosrius?
Yes, Dosrius features 3 fast and ultra-fast charging plugs (≥43 kW up to 50 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Dosrius?
Public charging infrastructure in Dosrius is mainly operated by ENDESA X WAY, S.L., among other regional networks.
Closest Neighboring Towns to Dosrius with EV Chargers
Physical proximity calculated via GPS Haversine distance from Dosrius
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.