EV Charging Stations in Albuera, La (Badajoz)
As of 24/10/2026, the municipality of Albuera, La (Badajoz) has a total of 1 active public charging stations, with 1 dedicated charging bays and 1 connectors in service. Maximum power output reaches 7.4 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Albuera, La
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 1 Dedicated bays
- Active Plugs
- 1 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 7.4 kW Peak recorded
Available Connectors in Albuera, La
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 1 plug |
Power Distribution in Albuera, La
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 1 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Albuera, La
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Albuera, La
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Albuera, La
How many public EV charging points are there in Albuera, La?
Albuera, La currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 1 operational charging plugs.
Are fast charging stations available in Albuera, La?
Currently, charging stations in Albuera, La provide standard and semi-fast charging up to 7.4 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Albuera, La?
Public charging infrastructure in Albuera, La is mainly operated by Wenea Services Spain, S.L., among other regional networks.
Closest Neighboring Towns to Albuera, La with EV Chargers
Physical proximity calculated via GPS Haversine distance from Albuera, La
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.