EV Charging Stations in Lanzahíta (Ávila)
As of 24/10/2026, the municipality of Lanzahíta (Ávila) has a total of 1 active public charging stations, with 1 dedicated charging bays and 1 connectors in service. Maximum power output reaches 22 kW, with 0 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Lanzahíta
Official consolidated metrics from the public MITECO registry
- Stations
- 1 Physical locations
- Charging Points
- 1 Dedicated bays
- Active Plugs
- 1 Operational outlets
- Fast Charging
- 0 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 22 kW Peak recorded
Available Connectors in Lanzahíta
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 1 plug |
Power Distribution in Lanzahíta
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 0 plugs |
| Semi-fast (7.4 to 22 kW) | 1 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Lanzahíta
1 stations mappedInteractive EV Charging Map
1 charging stations ready to explore
All EV Charging Locations in Lanzahíta
Verified specs, connector types and speeds from the official ministry registry
Frequently Asked Questions in Lanzahíta
How many public EV charging points are there in Lanzahíta?
Lanzahíta currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 1 operational charging plugs.
Are fast charging stations available in Lanzahíta?
Currently, charging stations in Lanzahíta provide standard and semi-fast charging up to 22 kW, ideal for hotel, shopping and destination charging.
Which charging networks operate in Lanzahíta?
Public charging infrastructure in Lanzahíta is mainly operated by HERNAZOS GESTIÓN S.L, among other regional networks.
Closest Neighboring Towns to Lanzahíta with EV Chargers
Physical proximity calculated via GPS Haversine distance from Lanzahíta
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.