EV Charging Stations in Carreño (Asturias)
As of 24/10/2026, the municipality of Carreño (Asturias) has a total of 5 active public charging stations, with 7 dedicated charging bays and 13 connectors in service. Maximum power output reaches 60 kW, with 10 fast or ultra-fast plugs (≥43 kW).
Key Infrastructure Metrics — Carreño
Official consolidated metrics from the public MITECO registry
- Stations
- 5 Physical locations
- Charging Points
- 7 Dedicated bays
- Active Plugs
- 13 Operational outlets
- Fast Charging
- 10 ≥ 43 kW
- Ultra-Fast
- 0 ≥ 150 kW
- Max Power
- 60 kW Peak recorded
Available Connectors in Carreño
| Connector Type | Active Plugs |
|---|---|
| Tipo 2 (Mennekes) | 4 plugs |
| CCS Combo 2 | 7 plugs |
| CHAdeMO | 2 plugs |
Power Distribution in Carreño
| Power Rating | Plugs |
|---|---|
| Ultra-fast (≥ 150 kW) | 0 plugs |
| Fast (43 to 149 kW) | 10 plugs |
| Semi-fast (7.4 to 22 kW) | 3 plugs |
| Standard (< 7.4 kW) | 0 plugs |
EV Charging Stations Map in Carreño
5 stations mappedInteractive EV Charging Map
5 charging stations ready to explore
All EV Charging Locations in Carreño
Verified specs, connector types and speeds from the official ministry registry
Casa Gerardo
Tanatorio La Cruz - Candás
O-Carreño-001
Repsol ES, CRED EL MONTICO II
Frequently Asked Questions in Carreño
How many public EV charging points are there in Carreño?
Carreño currently has 5 public charging stations registered in the official Spanish Ministry (MITECO) database, providing 13 operational charging plugs.
Are fast charging stations available in Carreño?
Yes, Carreño features 10 fast and ultra-fast charging plugs (≥43 kW up to 60 kW), suitable for rapid road trip top-ups.
Which charging networks operate in Carreño?
Public charging infrastructure in Carreño is mainly operated by ERANOVUM E-MOBILITY, S.L., EDP CLIENTES SAU, IBERDROLA CLIENTES S.A.U, among other regional networks.
Closest Neighboring Towns to Carreño with EV Chargers
Physical proximity calculated via GPS Haversine distance from Carreño
This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.
Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.