EV Charging Stations in Noia (Coruña, A)

How many EV charging points are there in Noia?

As of 24/10/2026, the municipality of Noia (Coruña, A) has a total of 1 active public charging stations, with 2 dedicated charging bays and 2 connectors in service. Maximum power output reaches 22.17 kW, with 0 fast or ultra-fast plugs (≥43 kW).

Key Infrastructure Metrics — Noia

Official consolidated metrics from the public MITECO registry

Data as of: 24/10/2026
Stations
1
Physical locations
Charging Points
2
Dedicated bays
Active Plugs
2
Operational outlets
Fast Charging
0
≥ 43 kW
Ultra-Fast
0
≥ 150 kW
Max Power
22.17 kW
Peak recorded

Available Connectors in Noia

Charging connectors by type in Noia
Connector TypeActive Plugs
Tipo 2 (Mennekes)2 plugs

Power Distribution in Noia

Charging plugs distribution by power in Noia
Power RatingPlugs
Ultra-fast (≥ 150 kW)0 plugs
Fast (43 to 149 kW)0 plugs
Semi-fast (7.4 to 22 kW)2 plugs
Standard (< 7.4 kW)0 plugs

EV Charging Stations Map in Noia

1 stations mapped

Interactive EV Charging Map

1 charging stations ready to explore

All EV Charging Locations in Noia

Verified specs, connector types and speeds from the official ministry registry

Frequently Asked Questions in Noia

How many public EV charging points are there in Noia?

Noia currently has 1 public charging station registered in the official Spanish Ministry (MITECO) database, providing 2 operational charging plugs.

Are fast charging stations available in Noia?

Currently, charging stations in Noia provide standard and semi-fast charging up to 22.17 kW, ideal for hotel, shopping and destination charging.

Which charging networks operate in Noia?

Public charging infrastructure in Noia is mainly operated by REPSOL SOLUCIONES ENERGÉTICAS SA, among other regional networks.

Closest Neighboring Towns to Noia with EV Chargers

Physical proximity calculated via GPS Haversine distance from Noia

All towns in Coruña, A
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.